Iran–Armenia Wind Farm
Iran-Armenia Wind Farm |
Status |
Under construction |
Commission date |
2009 |
|
Power station information |
Primary fuel |
Wind |
Generation units |
45 |
|
Power generation information |
Maximum capacity |
90 MW |
The Armenian and Iranian energy sectors are currently jointly constructing the Iran-Armenia Wind Farm which is set to become the country's largest wind farm, having an installed electric capacity of 90 MW. [1]
As of 2008, the Lori 1 Wind power plant is Armenia's only wind power plant. Completed in December 2005 by the Iranian company "Sunir" with funding from Iran, it consists of 4 wind turbines and has a capacity of 2.64 MWe. It is located along the Bazum Mountains at Pushkin Pass () in Armenia's northern region of Lori. In 2006, the Lori 1 WPP generated only 2.6 GWh of electricity (a yearly average of 296.8 KWe—about 11% of installed capacity).[2]